
72% OF BATTERY FIRES HAPPEN DURING CONSTRUCTION. SUBCONTRACTORS DON'T REALLY CARE.




The BESS Construction Safety Crisis
Your Daily Reality:
Thermal Runaway Doesn't Wait for Your Toolbox Talk
Arc flash hazards reaching 19,000°C. Stranded energy creating shock risks for weeks. Your pre-starts cover the protocols, then workers ignore them when schedules tighten.
Six Subcontractors, Six Safety Cultures, One Catastrophic Risk
EPRI data shows 36% of failures trace to construction errors, not battery defects. You need unified safety across contract boundaries, but you're managing through clipboards.
Your Safety Team Can't Be Everywhere
Two safety managers covering four sites simultaneously. Meanwhile 26% of BESS units show fire suppression defects found during commissioning. Problems happen when you're not watching.
Fire Risk Is Your Client's Biggest Fear
Every project includes community consultation about fire safety. Clients demand visible evidence of contractor engagement. You need more than compliance – you need demonstrated culture.
Purpose-Built for Battery Energy Storage Construction

Thermal Management Champions
Problem Solved: Workers treating battery systems like standard electrical work despite catastrophic fire risk
Cross-Contractor Safety Alignment
Problem Solved: Inconsistent safety engagement across six different subcontractors with no unified culture
.png)

Force Multiplier for Stretched Safety Teams
Problem Solved: Two safety managers covering 4-6 simultaneous BESS projects during Australia's construction boom
Proven Results from Australian Builders
The Construction Bottom Line
Real ROI Calculator:
Get detailed ROI report →Live in 48 Hours
Day 1: Setup (2 hours)
● Customise recognition categories
● Set budgets and controls
Day 2: Launch (1 hour)
● Send worker invitations
● First rewards issued
Week 1: Adoption
● Daily recognition happening
● First near-misses reported
Month 1: Results
● Reduced documentation time
● Improved safety metrics
